pixel_of_moral_decay t1_j5gf685 wrote

Not a structural engineer.

Looks intentional to my eye.

They're aligning the downward forces directly to the below support column. Rather than built structure to transfer the load to something else (think the header of a door or window transfer weight above to the jack stud).

I believe inspections are done per floor during construction in JC, something that irks developers as it really slow the process. So an inspectors been on site each time.