nodiaque OP t1_j0iia22 wrote
Reply to comment by FigureResponsible179 in Can I poor self leveling concrete on uncure concrete? by nodiaque
Ok, so cure time is 5 days if I understand properly
nodiaque OP t1_j0i0lfy wrote
Reply to comment by Material_Swimmer2584 in Can I poor self leveling concrete on uncure concrete? by nodiaque
The very low part was already taken care off. Now it's leveling the 30 feets of slab. Very old house, moved a lot, lots of low and high spot and I wish people would simply answer the dam question instead of trying to convince to do something else. While I appreciate inputs and suggestion, at least cover the main topic.
nodiaque OP t1_j0hn9xz wrote
Reply to comment by ksandbergfl in Can I poor self leveling concrete on uncure concrete? by nodiaque
I do keep a slight slope, I just need it more leveled cause right now, it's very uneven. I already did 1/3 of the surface I need, I was waiting for the new plumbing to be done which is in the middle to do the rest. So now I'm wondering how much time I must wait with the new concrete and how to prep it if needed.
nodiaque OP t1_j0hn3fm wrote
Reply to comment by danauns in Can I poor self leveling concrete on uncure concrete? by nodiaque
It's about 600 square feet. The level is very bad. Where the new concrete is its little, but overall it's half of my basement (I already did 1/3 of that place though). It used to have a 2.5inch slope in that room alone because of the drain.
nodiaque OP t1_j0iid6m wrote
Reply to comment by ItsGermany in Can I poor self leveling concrete on uncure concrete? by nodiaque
Ah thank you. Just too bad because I got 5 days off and was wishing to continue the basement and this make a very big hold, but better do it right.
Thanks