nodiaque OP t1_j0i0lfy wrote

The very low part was already taken care off. Now it's leveling the 30 feets of slab. Very old house, moved a lot, lots of low and high spot and I wish people would simply answer the dam question instead of trying to convince to do something else. While I appreciate inputs and suggestion, at least cover the main topic.

1

nodiaque OP t1_j0hn9xz wrote

I do keep a slight slope, I just need it more leveled cause right now, it's very uneven. I already did 1/3 of the surface I need, I was waiting for the new plumbing to be done which is in the middle to do the rest. So now I'm wondering how much time I must wait with the new concrete and how to prep it if needed.

1