jitb718

jitb718 t1_iwos6yr wrote

I have become numb to the traffic on 508 at this point. When it originally came up, I posted about it in the JC sub. I called and was told the project would last years but then someone else posted about a portal bridge, and the construction would only last until around now (mid-November). Trying to add the link below to my thread.

https://www.reddit.com/r/jerseycity/comments/xqbi06/cr_508_construction/?utm_source=share&utm_medium=ios_app&utm_name=iossmf

3