Tall_Disaster_8619 t1_j5vhr59 wrote
Fix the damn T. I don't know what engineers the T hires, but let's look for ones with GPAs higher than 2 in the future. We've had trains since the 1800s in this city, so maybe the engineers should study how the engineering was originally done. Now they have fancy software and tons of tech to help and they still can't get it done.
I'm not an engineer, but I don't think third rails and wheels on tracks are particularly confusing things. Electricity and mechanics, that's what engineers take in their first year. The T always finds PR chumps to explain away slow zones, but if someone can run faster than the train, there is clearly a major issue.
What am I missing? Are the T engineers still using slide rules?
h_to_tha_o_v t1_j5y7v34 wrote
Or maybe this, instead of building new lines, we should maintain the ones we have.
Tall_Disaster_8619 t1_j5yih4k wrote
We should really be able to easily do both.
Viewing a single comment thread. View all comments