Viewing a single comment thread. View all comments

Kesshh t1_jecb3o1 wrote

We did our drain line by digging up everything and trenched down. Our run was almost 40’ (forgot) so there was quite a bit of grading we needed to do. The grade was held up by gravel, 4” drain pipe (ours have holes to drain along the way, not just the down spout), fabric wrap to prevent clogging, gravel topped, then soil back fill, then everything went back on top.

1